Page 37 - 19BAR0037
P. 37

Figure 18: Structural I-Section with Cross-Bracing, Hidden Behind Dry Wall
                     Panels
                        Thesis Report V-SPARC VIT


                     2.2.4.5. Air-conditioning System


                            The  entire  structure  is  air-conditioned  through  an  air-handling-unit
                     system as seen in Figures 19 and 20. Cool water pipes feed these systems kept

                     in  accessible  service  corridors  on  either  side  of  the  structure,  ensuring  a

                     constant supply of cold air. These pipes received chilled water from chiller
                     units  that  are  located  on  the  service  block  adjacent  to  the  extension.  To

                     address the volume of people, insulated fresh air pipes are also provided to

                     mix in treated air from time to time.











                                                               37
   32   33   34   35   36   37   38   39   40   41   42