Page 12 - 19BAR0024
P. 12
LIST OF FIGURES
Page
Figure 1 Project methodology 3
Figure 2 Sanitary requirement in public building 10
Thesis Report V-SPARC VIT
Figure 3 Site location 16
Figure 4 Site accessibility 17
Figure 5 Aero hub mall vertical spatial arrangement 18
Figure 6 Ground floor area distribution 19
Figure 7 First floor area distribution 19
Figure 10 Mall entry points 35
Figure 11 Restroom location 36
Figure 12 Lift locations 36
Figure 13 Stair case location 36
Figure 14 Site location 3
Figure 15 Site Accessibility 5
Figure 16 Wind and Sun path 6
Figure 17 Site contours 7
xiii