2.2. Case Study-1- Vashi Railway Station
2.2.3. Aim
• Understanding how a station level TOD works in Indian context.
• Effective use of multimodal integration.
• How different activities cater to different users.
• Understanding how private and public spaces are allocated.
• User circulation.
Thesis Report V-SPARC VIT
• Alternative design to office spaces.
• Understanding the trends of 20th century.
2.2.4. Introduction
The vashi station have been carefully planned with a number of amenities
surrounding it. The station is faced towards a large open square with 6 square
catering to different needs such as parking, shops etc. A number of tall office
buildings and cultural spaces are arranged surrounding the square. The square
also ensures movement between the malls and commercial plazas on both the
sides.
• Built -1992
• TOTAL AREA - 90,000 SQ.M.
• TOTAL BUILT UP AREA - 71,723 SQ.M.
• FOR RAILWAY USE - 7,914 SQ.M.
• FOR C.I.D.C.O. USE - 63,809 SQ.M.
• APPROX COST OF THE PROJECT - 8 022 LAKHS
• LEVELS - G+7
• OFFICE - CIDCO & INTERNATIONAL
INFOTECH PARK