Page 32 - 19BAR0001
P. 32
Z
5.2.oning
Thesis Report V-SPARC VIT
F
)
)
Figure 24: Zoning (Source: authorPrivate to Public(Source: author
gur
i
25:
e
For developing the proper design language for the project, the plot was zoned in according
to the flow of the slope and the importance of different views and vistas. The more private
spaces were given in towards more sloped areas with interesting views towards the
agricultural field while the more public spaces were given in towards the road side making
those side more accessible and making it have less carbon issues. The entire site which was
cleared of the trees in the area had been chosen for the purpose of the design so as to not
affect the nearby trees immediately, from being cut down. The zoning therefore had been
done from a region of public to private with more interesting towards the private area.
5.3.ubble Diagramming
B
)
Figure 26: Bubble Diagram (Source: author
After the process of zoning the spaces so taken were considered and the bubble
diagramming was done according to the spaces which was mentioned in the program area.
The bubble diagramming was done according to the zones which was designated during the
earlier stages of the design process, i.e the zoning stage of the design process. The bubble
diagram was essential in plotting out the spaces according to the type of space they were (in
terms of public or private) and was essential in figuring out the general flow of design
throughout the site.