Page 37 - 19BAR0034
P. 37

5.2. FTamil Nadu municipalities hill station, building rules, 1993



            SI NO  Description           Continuous building area

                                         if the Project is more than 12 lakhs
            1       Brief statment       Construction should not affect scenic beauty
                                         Prove architectural and esthetic harmony with ecology
            2       Steep                Less tham 1:3 (Height:width) not building constructions
                                         Stability of the soil verified by engineers
            3       Soil
                                         Made up soil within the site should not be used for construction
                                         Permit only if suitable to avoid flooding
            4       Storm water          (Storm water course)
                                         Or raise land to avoid flooding
                                         Clearence of aerial lines
                                         If accessible- horizontally- LT- 1.5m, HT-1.75m
            5       Location             If not accessible- horizontally- 1.25m
                                         If accessible- vertically- 2.5m
                                         If not accesible- vertically- 1.25m

                                         site to be away by
                      Thesis Report V-SPARC VIT
                                         200m away from park
                                         100m away from park

                                         Street width more than 6m
                                         l less than 10m ,width- 1m
            6       Access
                                         l 10-30m, width- 1.5m
                                         steep 1:10 (Height: width)
                    Location of the
            7                            15m away from tank, reservoires, ponds,etc. Prevent contamination
                    building
                                         150m away from reserved forest and wood lands

                                         Stability check- combined dead and superimposed load transfer to
                                         subsoil
            8       Foundation           Depth, immunity damage
                                         Pile foundation- Loose and high depth if building more than 10m in
                                         length.
            9       Plinth               Avoid effectual damage- 4.5m and above
                                         Stability of the soil verified by engineers
            10      Superstructure
                                         Made up soil within the site should not be used for construction
                                                        Table 5.2

               5.3. Tamil Nadu Government Gazette Extraordinary

                                                           29
   32   33   34   35   36   37   38   39   40   41   42