3.1.6. Service infrastructure:
3.1.6.1. Parking:
The complex can accommodate up to 2150 vehicles out of which 750
are car parking slots and 1400 are bike parking spots.
The parking levels are well-structured with clear signage, wide lanes,
Thesis Report V-SPARC VIT
and adequate space for maneuvering vehicles
3.1.6.2. Multiplex
PVR cinemas with 5 screens of varying sizes from 180 seaters upto 300
seaters max.
3.1.6.3. Vertical transportation:
The mall has one escalator right in the atrium for people to access across floors, 3
public lifts and 3 service lifts for vertical movement.
There are totally 8 fire staircases across the mall, 6 inside the mall and 2 in the
multi- level parking area.
3.1.6.4. Air conditioning:
Whole complex is centrally air conditioned through 2 AHU rooms are located in
first, second, third floors and fourth floors.
Separate pipes are used to carry water and chilled water that run up to a terrace
where chilled tower is situated.
3.1.6.5. Mechanical and water treatment plant:
The diesel generators and STP have been placed in the multi-level parking
complex to avoid noise and smell issues.
3.1.7. INFERENCE:
3.1.7.1. Positives:
3.1.7.1.1. Aesthetics:
The mall has a "curtain wall facade" with large glass panels that are integrated
with metallic panels. This combination has a strong visual impact, providing a sense of