Page 32 - 19BAR0007
P. 32
4. CASE STUDIES
4.1. Pre fabricated
Thesis Report V-SPARC VIT
Figure 12 – Pre fab (Source: https://www.artstation.com/artwork/RYYLkv )
Figure 12 : Pre fab
Almost all realized space elements
) (Skylab, Mir, and ISS modules)
Design: standard, simple to design
Launch: many (1 for each module)
Operation: immediate operational capabilities
Installation: easy pre-integration of equipment and
utility systems, can be installed and checked prior to
launch
Materials: have been demonstrated, good structural
integrity and reliability
Engineering: easy integration of windows
Constraints: habitable volume of internal capacity
increased only by adding modules
20