Page 23 - 19BAR0003
P. 23

4.2.  Concept based on circulation
                  The ground floor is raised to create a podium to allow the public traverse through the building

                  connecting the north and the west entrance. This provides seamless connectivity between the
                  park railway station and to the subway systems at the entrance of site. Through this the public
                  is welcomed into the site.



                   4.3.  Concept based on TOD
                    Thesis Report V-SPARC VIT
                  To cater to the daily needs of the people a variety of provisions are provided. The entrance of
                  the parka railways station is made pedestrian free with the road access and parking pushed
                  towards the west. This creates a pedestrian free zone between the building and the station.

                  The west side of the building can be designed as a podium with various small shops and daily
                  provisions which can cater to the users who are traversing between different transit.


                   4.4.  Zoning
                  The site size is very small and restricted thus careful zoning should be done. the zoning has

                  been done as per the user circulation. To cater to the fast-moving crowd on the west small
                  shop and kiosks with a plaza would help the users to just relax and take a quick bite. While

                  an atrium can be given to invite the people in and lead to the commercial complex. The
                  commercial complex can also have a supermarket and few apparel shops that can cater to the
                  users. Separate lobbies should be given for the office users and hotel users. The office drops

                  off and lobby can be given on the east while the hotel drop off is given on the west. Thus,
                  through this a common core can be achieved for all the different functions. Also given the site

                  below entrance and exit are compromised to single point with various exhaust spaces, entry
                  and exit  points leading  into  the site.  The  diagram  below shows the underground subway
                  connection and its access points.
























                                                             23
   18   19   20   21   22   23   24   25   26   27   28